Our Projects
Our experience and reliability are reflected in the major projects we have completed across our areas of expertise. These include:
- Civil, electrical, and communications installations at the Dorine 5, Mahogany A, Sonia A, and Mahogany B sites for ANDES PETROLEUM.
- Design, procurement, and installation of electrical control, protection, and power systems for gas-fueled GMPUs. More than 20 units, each rated at 1 MVA, have been installed for EP PETROECUADOR.
- Maintenance, installation, and connection work on electrical distribution lines and energized 13.8 kV substations at Auca Field, Block 61, operated by EP PETROECUADOR.
- Electrical interconnection of ORION ENERGY’s Eno and Ron well pads with the CNEL grid.
- Maintenance, installation, and connection work on electrical distribution lines and energized 13.8 kV substations at Lago Agrio Field, Block 56, operated by PETROAMAZONAS EP.
- Maintenance of various types of insulators and associated hardware on ANDES PETROLEUM’s 34.5 kV electrical distribution line.
- Electrical, instrumentation, and control services for the construction of facilities in Blocks B56, B57l, B57s, and B58 and their surrounding areas within PETROAMAZONAS EP’s northern operating area.
- Thermographic inspections for corona effects and energized maintenance work on 69 kV subtransmission lines and substations for CNEL EP UNIDAD DE NEGOCIOS EL ORO.
- Energized maintenance and repair of 13.8 kV overhead distribution networks belonging to the Cuyabeno/VHR electrical system within its service area, for PETROECUADOR EP.
- Preventive and corrective maintenance on energized substations, 69 kV subtransmission lines, and 13.8 kV distribution networks for CNEL EP UNIDAD DE NEGOCIOS EL ORO.
- Maintenance, installation, and connection work on 13.8 kV distribution lines, 69 kV subtransmission lines, and energized 13.8 kV substations in Block 56, Lago Agrio, operated by EP PETROECUADOR.
- Engineering, procurement, and construction services for 13.8 kV electrical distribution lines in Cuyabeno, operated by EP PETROECUADOR.
- Replacement of medium-voltage line structures while the lines remained energized, for CNEL EP UNIDAD DE NEGOCIOS EL ORO.
- Preventive and corrective maintenance on 13.8 kV overhead distribution lines and 69 kV subtransmission lines in Block 55–61, operated by EP PETROECUADOR.
- Comprehensive electrical and mechanical maintenance of 8BT2 switchgear at 34.5 kV at Baltra Substation, for Empresa Eléctrica Provincial Galápagos Elecgapalagos S.A.
- Predictive and corrective maintenance of the 230 kV Due–San Rafael transmission line for HIDROALTO.
- Predictive and corrective maintenance of the 230 kV San Bartolo–Sopladora transmission line for HIDROSANBARTOLO.
- Predictive and corrective maintenance of the 69 kV Calope–Quevedo transmission line for ENERMAX.
- Predictive and corrective maintenance of the 230 kV Due–San Rafael transmission line for HIDROSANBARTOLO.
- Installation of 100 Trafomix units and associated equipment on energized 13.8 kV systems for CNEL EP UNIDAD DE NEGOCIOS LOS RÍOS.
- Maintenance of a 34.5 kV underground distribution line in Block 43 for PETROECUADOR EP, including testing and cable splicing.
